Long Construction Stop 2023 | Warning

Colombia

Details

Verified:
about 2 months ago
Altitude:
1072.2 masl
Contributor:
reddwalitzki

Amenities

Something not right?

Description

Construction for repairing a major landslide in this spot. I came through here 2 weeks apart and it was still the same, looks like it will continue a while. They seem to have time windows for letting traffic through, which can be up to 2 hours. I arrived at 10am the second time and they told me 12pm for the next wave.
If you’re in a Moto you can head to the front and possibly squeeze through when an emergency vehicle (police/ambulance) is let through.
Road on either side is paved and in excellent shape from RioSucio to Filadelfia

Photos

Why? By checking in after you’ve visited a place you let others know this place is still functional. You can also add or correct any information.

Add To Favorites

Latest Check-Ins

Construction is very much still active here, but they seem to be letting both sides go with more frequency. We did not have to wait for long.

Report Check-In

No construction anymore. Traffic is in both was normal

Report Check-In

Construction for repairing a major landslide in this spot. I came through here 2 weeks apart and it was still the same, looks like it will continue a while. They seem to have time windows for letting traffic through, which can be up to 2 hours. I arrived at 10am the second time and they told me 12pm for the next wave.
If you’re in a Moto you can head to the front and possibly squeeze through when an emergency vehicle (police/ambulance) is let through.
Road on either side is paved and in excellent shape from RioSucio to Filadelfia

Report Check-In

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Learn More.